Additional information
| Weight | .7 lbs |
|---|---|
| Dimensions | 8 × 4 × 3 in |
| Waterproof | Yes |
Starting At: $34.76 USD
Save now with blowout pricing on these existing single wire cables while supplies last. Blowout cables are non-returnable/final sale.
Our transconnect cables are perfect for running power from your transformer to your lighting. Available in lengths from 20 ft – 60 ft so no matter your lighting setup, we have a connector cable to fit your needs.
DEKOR® Lighting is transitioning to new and improved wiring, replacing clear (single wire) with black heavy duty (2-wire). We carefully designed this new system to be backwards compatible with our current clear wire cables.
Want to buy the new cables? Click Here
| Weight | .7 lbs |
|---|---|
| Dimensions | 8 × 4 × 3 in |
| Waterproof | Yes |
Click here for most current information: WARRANTY POLICY.
When you choose DEKOR® lighting solutions, your order is built and assembled by true craftsmen. Our make-to-order approach means that we manufacture most of the products in your order, making sure they meet higher quality standards and a higher standard of craftsmanship than mass-produced products.
Your Partner in Custom Design and Build Solutions

2655 S. Santa Fe Unit 4-A
Denver, CO 80223 USA
Toll Free: 1-800-258-0344